Orbital 25, Watford
This is one of eight blocks on the site with each block having up to 10
units. The last block was completed in the spring of 2008. George Voyias
was Project Engineer responsible for the design of all the internal
roads, junctions to the main road, as well as the foul-water and
storm-water drainage systems.
For the junctions to the main road
outside the site the design and construction was subject to approval by
Hertfordshire Highways involving a Section 278 Agreement.
The storm-water drainage has two large
Class 1 petrol interceptors each discharging into 350mm diameter pipes
before connection into the public sewer. |